Tuesday, December 02nd, 2008 | Author: Chase
Time for the plumbing

Time for the plumbing

So I stopped by the lot the Tuesday before Thanksgiving and saw that they have dug lots larger trenches, getting prepared for the piping, and soon after the foundation to be poured.  I also stopped by the Saturday after Thanksgiving to see all the piping pointing towards the sky, all ready for the inspection.

I got a phone call from Celeste last night with an update, the plumbing inspection is scheduled to take place today, and more than likely the beginning of next week the foundation will be poured.  Once the foundation gets poured, it’s off to the races.  I saw how fast the walls go up after that.  It’s all very exciting, so stay tuned for all the updates, I will be sure to get them all posted!

You can follow any responses to this entry through the RSS 2.0 feed. You can leave a response, or trackback from your own site.
Leave a Reply